Brooks ADU

I have waxed poetic in many past posts on this project and my work in general, at the end of the day we must move on. The house belongs to the owner. Our job is done.

It did take a while.

We hit some snafus.

What work does not?

Here is what we did accomplish:

8 hours to frame. Versus 60+ to frame conventionally.

Custom shape. No upcharge.

Sheds snow and rain. Without gutters.

Shades summer sun. No extra overhang.

No drywall.

Low embodied carbon.

Linoleum floor.

Low embodied carbon.

Air Change per Hour: 1.6 (code 3.0, Passive House 0.6)

HERS Index Score 46 (code sets a max of 60)

We also made a beautiful dwelling that should be a pleasure to live in, Watch our video: Brooks ADU